ULSA

Daily Archives: Jan 2, 2009

Rowten – Valley entrance

Rowten - Valley entrance Friday, 2 January 2009 Excellent trip down Rowten (via the Gully route, and 3rd/4th pitches) and through the rowten sumps (first time for John) and out valley entrance. A soaking wetsuit before the trip meant for a grade V change though. Brrrrrr!!!!! Images John on gully pitch Posted by: Mike...

Hammer Pot new pitch

Hammer Pot new pitch Friday, 2 January 2009 A return was made to Hammer Pot over the last week, Tom helped carry ropes in on 30/12/08 prior to Mike C and I going for a longer trip on 02/1/06. On the trip with Tom we rigged the pitches to the head...

Archive